COPPER Copper production TU Delft
Copper concentrators typically treat up to 100 000 t of ore per day They are located directly at the mines to achieve low transport costs The copper recovery efficiency is over 90 About 95 of the ore input goes into the tailings which are stored in large dams near the mine and are used for water recycling to the flotation stages